  12-21-25

 

   The first contract was awarded on the consolidation project at our November 2025 meeting. This is only the first phase of the project, in the amount of 1.8 million dollars, which will consist of installing the pressure line along US 127. Equipment is already on site and excavation should begin very soon.

  We have finished the rehab project for Tanks 1 and 2 at the Coolbrook plant. There were holes rusted out at the bottom of these tanks which required pumping the tanks out, cleaning them, and extensive welding and inspection of the remaining tank. They should be back online as new aeration lines are installed, and should greatly help with processing wastewater and elimination of odor.

 

 Feb 10, 2022

   Edgewood Plant - The new airlines are installed and running, we are now using a new liquid disinfectant due to scarcity of chlorine.

 

  Huntington Woods -  The rehab of the main tank has been completed. New diffuser banks have been installed, operator will be installing new diffusers as soon as the weather permits and the plant should be back up and running. New chemical disinfectant system will be installed soon after.

  Below are pics of work in progress, and accumulated trash that should never be flushed down your toilet.

 